The paper is dedicated to investigating the problem of optimal planning at the steelmaking converter shop-floor. An integer linear program is proposed, which takes into account all major technological constraints. The objective is to minimize the total cost of daily task processing, leading to a significant reduction in overall production costs. Numerical experiments were conducted using real-world data, demonstrating the strength and effectiveness of the proposed approach.