1 | Гафаров Е.Р., Долгий А.Б. Hard Special Case and Other Complexity Results for SALBP-1. Aubiere, France: Universite Blaise Pascal, 2012. – 13 с. | 2012 |
2 | Гафаров Е.Р., Долгий А.Б. Two Customized Parallel Machines Scheduling Problem with Precedence Relations. Aubiere, France: Universite Blaise Pascal, 2012. – 10 с. | 2012 |
3 | Гафаров Е.Р., Долгий А.Б. Two-Station Single Track Railway Scheduling Problem With Equal Speed of Trains. Aubiere, France: Universite Blaise Pascal, 2012. – 13 с. | 2012 |
4 | Гафаров Е.Р., Долгий А.Б., Werner F. Dynamic Programming Approach to Design FPTAS for Single Machine Scheduling Problems. Aubiere, France: Universite Blaise Pascal, 2012. – 26 с. | 2012 |
Статьи в журналах/сборниках из перечня Web of Science/Scopus |
5 | Гафаров Е.Р., Долгий А.Б. Cana Branch and Bound algorithm solve all instances of SALBP-1 efficiently // IFAC-PapersOnLine. 2019. Volume 52, Issue 13. С. 2788-2791. | 2019 |
6 | Бахтадзе Н.Н., Долгий А.Б., Лотоцкий В.А., Сабитов Р.А., Смирнова Г.С., Сабитов Ш.Р., Сиразетдинов Б.Р. Design of a Multi-agent System to Manage Relay Intercity Freighting // IFAC-PapersOnLine. 2016. T. 49, № 12. С. 1656-1661. | 2016 |
7 | Гафаров Е.Р., Долгий А.Б. Two-dedicated-machine scheduling problem with precedence relations to minimize makespan // Optimization Letters. 2013. Vol. 7. С. DOI 10.1007/s11590-013-0671-0. | 2013 |
8 | Бахтадзе Н.Н., Лотоцкий В.А., Максимов Е.М., Долгий А.Б. Intelligent Identification Algorithms for Frequency/Power Control in Smart Grid // IFAC-PapersOnLine. 2012. Vol. 14, No. 1. С. 940-945. | 2012 |
9 | Бахтадзе Н.Н., Долгий А.Б. Planning and Control of Manufacturing and Logistic Systems // Annual Reviews in Control. 2010. V. 34, №1. С. P.71-72. | 2010 |
Пленарные доклады и доклады из перечня Web of Science/Scopus |
10 | Гафаров Е.Р., Долгий А.Б., Лазарев А.А., Werner F. A Graphical Approach for Solving Single Machine Scheduling Problems Approximately / Proceedings of the 7th IFAC Conference on Manufacturing Modelling, Management, and Control (MIM`2013, Saint Petersburg). СПб.: ИПУ РАН, 2013. С. 1356-1361. | 2013 |
Доклады |
11 | Гафаров Е.Р., Долгий А.Б., Лазарев А.А. SOLUTION ALGORITHMS FOR THE TWO-STATION SINGLE TRACK RAILWAY SCHEDULING PROBLEM / Proceedings of the 6th Multidisciplinary International Scheduling Conf erence: Theory & 6th Multidisciplinary International Scheduling Conf erence: Theory & Applications (MISTA 2013, Ghent, Belgium). Gent, Belgium: The Belgian Operational Research Society, 2013. С. 636-640. | 2013 |
12 | Гафаров Е.Р., Долгий А.Б., Лазарев А.А., Werner F. A Graphical Algorithm for Solving an Investment Optimization Problem / Proceedings of the 6th Multidisciplinary International Scheduling Conf erence: Theory & 6th Multidisciplinary International Scheduling Conf erence: Theory & Applications (MISTA 2013, Ghent, Belgium). Gent, Belgium: The Belgian Operational Research Society, 2013. С. 290-299. | 2013 |
13 | Гафаров Е.Р., Долгий А.Б., Лазарев А.А. Some Complexity Results for the Simple Assembly Line Balancing Problem / Proceedings of the III International Conference on Optimization Methods and Application (OPTIMA-2012,Costa da Caparica, Portugal). М.: Федеральное государственное бюджетное учреждение науки Вычислительный центр им. А.А.Дородницына РАН, 2012. С. 81-85. | 2012 |
14 | Лазарев А.А., Гафаров Е.Р., Долгий А.Б. Notes on Complexity of the Simple Assembly Line Balancing Problem / Труды 3-й Всероссийской конференции с международным участием «Технические и программные средства систем управления, контроля и измерения» (УКИ-2012, Москва). М.: ИПУ РАН, 2012. С. 259-266. | 2012 |
Тезисы докладов |
15 | Гафаров Е.Р., Долгий А.Б. Two Dedicated Machines Scheduling Problem in Two-Sided Assembly Lines / Book of Abstracts of the International annual conference "Operations Research" (Hannover, 2012). Hannover: Institute of Production Management Leibniz Universitat Hannover, 2012. С. 174. | 2012 |