42994

Автор(ы): 

Автор(ов): 

3

Параметры публикации

Тип публикации: 

Статья в журнале/сборнике

Название: 

Long-term production planning problem: scheduling, makespan estimation and bottleneck analysis

Электронная публикация: 

Да

ISBN/ISSN: 

2405-8963

DOI: 

https://doi.org/10.1016/j.ifacol.2017.08.991

Наименование источника: 

  • IFAC-PapersOnLine

Обозначение и номер тома: 

Volume 50, Issue 1

Город: 

  • Toulouse

Издательство: 

  • Elsevier

Год издания: 

2017

Страницы: 

7970–7974 http://www.sciencedirect.com/science/article/pii/S2405896317314659
Аннотация
In this paper, a long-term production planning problem is considered with the objective criteria Cmax and Tmax and under resource capacity and precedence constraints. The case study presented is characterized by four years planning horizon, 3552 operations, 51 workers and 57 units of equipment. The solution method elaborated in this study is a heuristic algorithm. Its performances are evaluated in numerical experiments. New procedures for makespan and resource load estimation are developed in order to identify bottleneck resources. The makespan estimation algorithm is tested on the well-known PSPLIB benchmark library where the best known lower bounds are improved for 5 instances. This procedure can also be used for the estimation of the gap from optimal value of the makespan time provided by the heuristic algorithm.

Библиографическая ссылка: 

Архипов Д.И., Лазарев А.А., Battaia O.?. Long-term production planning problem: scheduling, makespan estimation and bottleneck analysis // IFAC-PapersOnLine. 2017. Volume 50, Issue 1. С. 7970–7974 http://www.sciencedirect.com/science/article/pii/S2405896317314659.